Skip to content
  • Economic Development and Regeneration
  • Transport Economics
  • News & Blog
    • Volterra News & Insights
    • Paul Ormerod Blog
  • About
    • Join us
    • Carbon Reduction Plan
  • Contact
Menu
  • Economic Development and Regeneration
  • Transport Economics
  • News & Blog
    • Volterra News & Insights
    • Paul Ormerod Blog
  • About
    • Join us
    • Carbon Reduction Plan
  • Contact
Linkedin

Day: 20 September 2021

Northern line extension – South London welcomes the long awaited arrival of two new underground stations

We are very pleased to see the opening of the London Underground Northern Line extension today, the first major addition to the Tube network this century. This brings much needed connectivity across the capital, carrying passengers to new stops at Nine Elms and Battersea Power Station. Battersea is now only a 15-minute direct ride from […]

Pelham Street – Planning consent for the development of two office schemes on Pelham Street in South Kensington has been granted.

Plans to deliver approximately 12,000 m2 (GIA) of high-quality office floorspace across both schemes (40 Pelham Street, and 63-81 Pelham Street), which also includes a gym as part of the amenities, were recently approved by the Royal Borough of Kensington and Chelsea. At its core, the development will help satisfy the growing need for workspace […]

  • 020 4529 1736
  • info@volterra.co.uk
  • Chester House, Unit 2.01, 1-3 Brixton Road, London. SW9 6DE

Legals

  • Privacy Policy
  • Terms of Use

© All rights reserved